Watering rolling the raft footing area of crusher plant and placing the footing mat on it
Excavator removing loose soil in phase 3
Marking given for plinth beams for entry portal arch.
gravel filling to 40 feet road for levelling at phase 3
Received crusher plant material to site.
Sloping the 60 feet road is in progress at phase 3